Devils Lake East End Outlet
DEVILS LAKE EAST END OUTLET OUTLET STRUCTURES AND PIPE - CONTRACT 7
DEVILS LAKE, NORTH DAKOTA
This project was the outlet structures and piping which receives water from Devils Lake at the new East End Inlet and then transferred thru a 96” pipeline into new structures. There are two structures and piping constructed, the outlet structure of 1,600 cuyd’s receives the water from the pipeline its function is to dissipate the flow of water from the pipeline and provide a rock filtering system. A 72” connection pipe line was installed to transfer the water from the outlet structure to the terminal structure. The terminal structure of 480 cuyd’s spreads the flow of water over the entire structure. The water then is emptied into the Tolna Coulee.
The project requirements included an extremely large liquidated damages clause if the project was not completed by July 2012 as the inlet was intended on being completed at the same time. We started in December of 2011 and worked thru winter conditions to complete the project on time.
The ND Ready Mix & Concrete Products Association presented Industrial Contract Services, Inc. with a 2012 Excellence in Concrete (Governmental Category) for their work on the Devils Lake East End Outlet.
SOLUTIONS PROVIDER.
Industry leading partner providing upfront and creative solutions for all your building solutions needs while minimizing business disruptions from project inception to completion.